Show BUILDING OF BIG DAM Ha HaIng Ing been awarded the th contract contract con contract tract for the building of ot the dam damon damon damon on the tb American Falls project on the tho Snake river riTer the th Utah company of ot Ogden Is requIred to set get et under way within thirty da das dai s sand and b by the end of the ear have the dam completed to the th toot foot contour In the th constructing of ot tho the dam the company will aill be bo required to excavate OOOO cubic lards ards of o earth build bund cubic lards ards ot of earth embankment do cubic lards ardi ards of ot rock atlon and place cubic lards ards ot of concrete with pounds Bounds ot of o rein rein- forcing steel a large lare quantity ot of structural steel and ot of I cast Iron gates eates It H Is an undertaking of consider considerable considerable able size lize but no company In the United States Is better equipped to todo todo todo do the th work The Utah Construction compan has gained a name nam for Cor reliability and rapid work and this Is due du in i part to the tb tact fact that the the th comp company ny is 13 capably managed and has hal had bada hala a wide experience |