Show Construction Slows Campus Traffic University students will be greeted by a network of tunnels crisscrossing the campus when they return to school on With the addition of the Pioneer Memorial Milton Bennion and the new girls' dormitory to the buildings already on a burden was placed on the existing heating To accommodate these new a heating plant was built southwest of the education Workmen are now in the process of laying a distribution system of pipes for high temperature water heating which will be connected to the new central heating Completion of the entire system is scheduled for CONTRACTORS ARE now working to have the crossings at 3rd and Campus Drive filled in and the metal protectors removed by the time school starts on New additions to the campus include both the south and wing of Milton Bennion The Audio j Visual Bureau has been transferred j to Milton Bennion and a j phy television and library have been added to the newly completed Plans for the new medical building are now complete and construction is scheduled to UTAH currently being constructed on Pictured here is excavation between the Union and the Center for Intercultural |