Show THREE UNIVERSITY students examine the excavation for the new campus Construe- i tion on the split-level building began last Completion is scheduled for University Bookstore Construction Started By SUSAN WOODLAND Chronicle Staff Writer Actual construction on the new University bookstore began Monday when the first excavation was The contractor made preparations for the construction last week with the removal of drainage lines of the parking lot east of the Geology IN ORDER to save the University transferred the black top from the parking area to another area across the street from the Bennion Education More display space for textbooks and supplies will be provided for in the new Over twice the amount of floor space is available in the new store as was in the present one and will provide for more efficient selection and CONSTRUCTION plans call for a split-level The textbook area will occupy the lower and supplies the A snack which has been included in the Bookstore since will not be in the new In the new all of the of floor space will be used for books and THE ADDITIONAL space will allow the Bookstore to carry approximately quality paperback At space has limited the number of paperbacks to about Another feature of the new building will be more cash registers so that a larger number of students may be accommodated in a shorter Along with the additional display this should insure prompt ACCORDING TO Seibert W. director of auxiliary students will be proud of their new bookstore since it planned for self-selection and quick Plans call for completion of the Bookstore by the beginning of September |