Show Letters to the Editor Library Gripe Dear In the library for the last two weeks there has been a set of wires from a light fixtures in the stacks handing down into the This set of mires is bare and is low enough to hit heads of students passing last summer an air conditioner was stalled the The pipes from this unit went through two Until last neither of the holes in the walls had been THE WORK was done by the campus shops and I know that when the shops contract to do a job they appropriated enough money to finish job Why is that they never quite finish what they appropriate enough money to finish the job Why is that they never quite finish what they start until someone I work in the library part and I have heard complaints from the patrons in regard to the above mentioned These unfinished jobs present a serious menace to besides being distracting to the I DO NOT want it inferred because I work in the library that this is an official This is my personal feeling on something about which I feel qualified to I think because of the time delay and poor quality it would be cheaper in the long run to hire private firms to do the jobs on DOUGLAS |