| Show ROAD AT WILLOW CREEK OREE K MOUTH TO BE IMPROVED an to the abate r the mouth monti of willow reek creek ran on wa approved nip app roel titis fills week by the state road commission ip the th the tile ron con gt ruction tion if of ft it new bridge originally it wa wait it d to flany the channel of billow millow creel fill the tild creek bed and install a new bridge at i another lother at point tip the r air a I 1 and the utah fuel hare have been unable to agree on a 3 its tribu tiou of the tile cost howe however pr so 0 o the tile new bridge will iv 14 built lit at the flit anie point its a before |