Show WORK ON DORMS FINISH mn mra D A A Cam onalle matron at of the high school iee wih rine 1 bevo hei bout about the middle of tax axt eek to assume charge of the work at the balij build ina lag repair repairs on which are just being completed competed for the opening of the school year the remodeling and redecorating work I 1 13 fat falt IteR tInE the plastering 11 a all till finished 0 05 the girls girl girlen sn s dorm dom and nothing remaining bet but painting in 9 and the upper tipper floor in the boy boys building is completed with the pa lateri at work in other part parts of the structure |