Show ROAD SNOWED SHOWED UNDE iC heavy storms have madi impassable the highway over soldier summit for the ithe time being it wa war reported rep artra to the road commission monday by J U el lie ils assistant road engineer mr ellis returned to salt lake after an inslee tion of a number of roads in the uintah basin and in carbon county with B W matteson Mat teon senior highway engineer for the bureau of public roads he ile de do clarid the storms of saturday and san sun dav had made the mud so 0 o deep aa as to make vehicle traffic over o ver the road impassable the engi engineer noer aid said however that the road would probably be dry and in shape for travel within a week |