Show MUCH WORK ON PIPELINE BEFORE BOUTE ROUTE IS PAVED state engineer II 11 C mean means returned to salt lake saturday L aa after hie his tour of inspection over the price crilio gate road ou on this tour he wa was led by lurinder Lu alneer J it loung of ogden member of the federal highway service aad A mayor W W jones ot of price it wa was found by aeve rica that the price 1 pipeline lne will rill bare t be worked over in n ten differed dif feren plates in order to con do D o WILL he be requirements of the pave wyit at where the pavement pa ement crones crosses the hits either the line must be of cast iron tipe pe or the present pipes must je e laid in grayel at the crossings 1 and tiled for or drainage the road at the helper bridge will probably be straightened mr means thinks and ant a sw w bridge installed at that iolet lot nt in order to make a more direct route and a safer of the river mr young to coguen saturday evening |