Show E R ROAD WORIC DELAYED BY RAIL PLANS overhead crossing work may be finished this winter reported improvement in the highway between henefer and echo is awaiting final details of the construction of an overhead passage over the union pacific tracks near henefer M S kerr engineer of the utah state highway commission reported to the ogden chamber of commerce who have been investigating the delay in 01 this piece of road this is the only portion of tl the w road between Co coalville alville and ogden that is not oiled and has become rather rough the details of the overhead crow cross ing have not been completely worked out with the union pacific he said and the summit county commissioners had expressed a desire to hold up the actual construction of the overhead so that work win will be finished this winter the me highway proper consisting of some seven miles has not been nate ly I 1 located or constructed to its permanent width he said and for that reason it is impossible to oil it at the present time |