Show I I I ITO POWER CONNECTS TO TELLURIDE SYSTEM Power was turned in the new ne volt line between Sigurd an d dWayne Wayne Vayne county at a a. a am a.m. m. m Saturday Saturday Saturday Sat Sat- September 10 Koosharem Johns Valley and Antimony are presently being served over this new line A little more work is needed be beCore before before be- be fore Core the Hydro plant at Torr Torrey y can be synchronized with Telluride When this work is completed electric elec elec- trig service will be available to the entire system from Telluride Telluride Telluride ride allowing the Power Company to discontinue the use of its expensive Diesel equipment |