Show Report o of Land an Classification 1 Made MadeA a e eA A progress report of land classification classification classification classi classi- and studies being carried out in the Colorado River Great Basin project project project pro pro- Investigation Investigation- b by the U. U S. S Bureau Bureau Bureau Bur Bur- eau of and the Water Vater Storage Commission was received re rp- this week by br State Engineer T. T H. H Humpherys from E. E G. G Niel Niel- Ni l- l sen son reclamation engineer in of or Utah investigations Mr NIelson n reported field work on of semi-detailed semi I Iland land classification and on ll I areas o of reconnaissance land classification classi class I has hns been completed in th I Delta Fillmore and Rush flush valley alley i iare are areas s. s Location of of canals lines I I from Lavan Laan ridge near Nephi westerly to Cedar Tooele and Rush Hush valleys and the Bingham area was completed in rn May MaJ according to the nIP I report Reports on available water supply for the proposed project are e expected expect ed cd to be he completed In June Vator I supply PI studies are being made In conjunction with the U. U S. S Geological Geological Geological ical g-ical su survey ne Efforts are now being concentrated ed on land classification in Cedar Tooele and Scull valleys according to the report studies studies studies stu stu- dies o of a canal route to Dugway and Scull va valleys will he be completed this thi month and work resumed on the aqueduct located In the basin |