| Show Navy Constructs Pearl Harbor Camp Washington Washington Bids Bids for the construe construe- tom of permanent barracks at nt a cost coat of or about at the jt submarine sub Bub- marine tharine baso Pearl Pear Harbor will be asked d b by the navy department about May 1 t. Tho The barracks are OC to be of of tho the reinforced concrete type n and d will be bo sufficiently commodious to accommodate late date 1200 men Funds for tor tho the project were made mado available in tho last naval bureau of ot construction and repair ex ex- poets to have all aU arrangements com com- so BO that actual construction may e Ln about July 1 L 1 |