Show Dam Wins Additional Backing I Long Beach Cal Immediate Immediate development de de- de- de of the Boulder dam darn project project project pro pro- keeping control ol under federal supervision of power to domestic water requirements and the building of the proposed high damin dam in preference to the low dam were advocated by speakers speakers- at a meeting of the southern Cal California ornia district of the Boulder Dam association Data showing the startling decrease of stream flows of California rivers rivers- was presented by Clyde Seavey member of the state railroad com corn mission The rapid diminishing of underground water l levels vels was advanced advanced advanced ad- ad ad ad- as an argument for immediate construction of the dam as a means means- of insuring future water supplies |