OCR Text |
Show - NOTICE TO WATER USERS i State Engineer's Oilice, Salt Lake j City, Utah, June 7, 1023 Notice is hereby given that P. B. McKeon, whose postoffice address is ; Milford, Utah, has made application in accordance with the requirements of the Compiled Laws of Utah, 1917, as amended by the Session Laws ot Utah, 1919, to appropriate Two Hundred Hun-dred (200) acre feet of water from Cove Creek in Millard County, Utah. Said water will be stored in a reservoir reser-voir from Jan. 1 to December 1, inclusive, in-clusive, of each year, by building a dam across the natural channel of Cove Creek, which will inundate land in SW 1-4, and E 1-2 ot Section 8, Township 25 South, Range 9 West, Salt Lake Base and Meridian. The center of the impounding dam will bear S 81 deg. 36 min. W 3320 feet from the E 1-4 corner of Section 8. township and range aforesaid. The water from the reservoir will be released re-leased and allowed' to flow down the natural channel of Cove Creek to a point 169.62 feet, East of SE cornel of Section 20. Township 25 S. R. 10 W., where the water spreads naturally natur-ally over the land to be irrigated. The water will be used from April 15 to October 1, inclusive, of each year to irrigate 1360 acres of land emDracea in w i-z section &; a l-z Sec. 6; SE 1-4 NE 1-4, NE 1-4 SE 1-4, 1-4, S 1-2 SE 1-4, Section 19; S 1-2 N W 1-4 Section 20; N 1-2 NE 1-4 Section Sec-tion 30; N 1-2 NW 1-4. W 1-2 NE 1- 4, Section 29; E 1-2 SW 1-4, SE 1-4 Section 7, Township 25, S., R. 10 W., 5. L. M. This application is designated desig-nated in the State Engineer's office as file No. 9276. All protests against the granting of application, stating the reasons there for, must be made by affidavit in duplicate, du-plicate, accompanied with a fee of $1 and filed in this office within .thirty (30) days after the completion ot the publication of this notice. R. E. Caldwell, State Engineer. First Published June 15, 1923 Last publication July 13, 1923. : |