Show TO REBUILD I PRICE RIVER DAM DiU AT A COST OF OP l OOOO I C. C J. J Ulrich assistant state engineer engineer engi engl- n neer neer er has concluded the checking up UJ of the water allotments for the surey survey survey sur sur- vey ey of or the Pricer Iver water project vey of the Price river water project acres of land and the rebuilding of the Mammoth dam darn at a cost of W. W W. W Jones engineer for the project stated that all details would be completed this week and ready for publication There Is approximately eighty sec sec- feet ond-feet of running water in the Price river distributed among the following owners The Farnum ditch Sniper ditch well ditch I Wellington Canal company Price Water company Pioneer ditches Nos 1 I and 2 Gay ditch Sp inglen Canal company Stowel ditch Prat-Ewell Prat 4 I ditch Bryner ditch ditch Platt Bryner ditch and Carbon Land Water Power company The contemplated rebuilding o othe othe of f the Mammoth dam which was lo located located located lo- lo on Gooseberry creek creele just jus above el recalls the washing g away by the flood waters of the concrete concrete concrete con con- crete core of this dam on July 7 1017 1917 7 and the havoc by the twenty foot wall of or water which forced its wa way through the Price Price- e canyon non changing the course of the stream in some places washing away awaya a number of houses at Castlegate and Helper and inundating a number number num num- ber ber of adjacent farms Many Many persons barely escaped d death th in the torrent but only one was drowned Miss 1 Hattie Hattle Peacock of Price The project when organized will wll be known as the Price river irrigation irrigation tion district |