Show New Outlet Being Built For Abraham Canal Workmen have started the construction con con- of or an addition to the Abraham Abraham Abraham Ab Ab- Ab- Ab raham outlet at the Gunnison Bend reservoir because the old one was becoming unsafe The plan calls for the new gates to be built three feet reet thick in front of the present gate as there is a alot alot alot lot of or concrete left in the old gate that is perfectly good These new gates will extend in front of the present one about three feet The reservoir is being gradually lowered to allow the work to bedone bedone be bedone done as it will take a drop in the water level of or five feet to do the work i |