Show New Airport Is By Engineers Airfield Found to Be in Accordance with Plans And Specifications Flying School May Be Maintained Here Soon On June 5 Harry Gerard Region Airport Engineer Harold G. G Orville Chief Construction Unit and John Rossiter Associate Airways Engineer Engin Engin- eer representing the Region Airways Airways Airways Air Air- ways Engineering Branch Clayton and Orval Jeffery of the City Council and Harry Clyde representing representing representing rep rep- resenting the Clyde Construction Company made a joint Inspection of the new airport The work was found in accordance accordance accordance accord accord- ance with the plans and specifications specifications specifications with a few minor lions Some wheel tracks needed to toI tobe tobe I be smoothed four small areas had to be filled where water was pond pond- ing and it was stated that the construction construction construction con con- buildings would have to tobe tobe tobe be moved and the site In general cleaned The additional work outlined will willbe willbe willbe be completed within a short time and then thea the airport will be formally formally formally for for- mally accepted The contract for lighting is to be belet belet belet let on June 15 so that work will commence within a short time on that end of the port The lighting will be different from rom the old airport airport airport air air- port with only the runways lighted instead of the whole boundary as was the old port The complete field will be fenced fenced fenced fenc fenc- ed later with a two wire electric fence and at the same time a contract contract contract con con- tract will be let to move the buildIngs buildings buildings build build- ings and equipment from the old airport to their new site When It is accepted the city will take over and maintain the field It is expected that it will be let to toa toa toa a department of the government or orto orto orto to a private firm with a government government government govern govern- ment contract within a short time The firm taking over has to be acceptable acceptable acceptable ac ac- ac- ac to the Region Airways and they will pass or reject the use to which the port will be put It is expected that some type of flying school will be put here but butas butas butas as yet the City Council has no bids nor for the port |