Show I I Will ail Complete n Road This Week S Seal Coat May Have to Wait until until until un un- til a Later Date When More Oil Will Be Available Those Thos in charge of the oiling of the Holden Delta road state that the work will be finished on Friday i or Saturday On Wednesday morning morning morning morn- morn ing they had but one and one half J miles of road to finish with oil and they feel that they are about done T The e road is completely graveled and oiled from the off takeoff at Holden Hoiden Holden Hol- Hol den den to Harding From the Delta end the road is is oiled out onto the new stretch toward Harding leaving leaving leav leav- ing but the short distance to be completed The seal coat which is applied after the other work is all done consists of a light sprinkling of oil on and then a coat of gravel on on- top of that At this time it is not Imo known Imon n whether of not the oil willbe will willbe willbe be available for this coat If it isn't put on within a short time the cold weather will stop the work and the final oiling will have to be done in the spring Tho Those e who have traveled the road load have much to say in the Improvement improvement improvement Im im- provement over the old highway They arc very enthusiastic about this oiling and feel that now Millard Millard Millard Mill Mill- ard County Is linked up with a avery avery avery very fine system of roads |