Show I City Building I Will Be Ready For Use Saturday I The newly remodeled city building building build build- bUild I ing is nearing completion and will willbe willbe willbe be ready for use this Saturday It would have been finished Thursday except that they lack labor on some of the wiring and plumbing The building has been remodeled from the Killpack Garage with many rooms made for the different departments of the city The entrance entrance entrance en en- trance way leads e either ther to the li library library li- li to the north or to the office of the city clerk where water accounts accounts accounts ac ac- ac- ac counts and general work of the city clerk cler will be cared for The lI- lI lIbrary li library has a large reading room to the north and back of that there is a large book room running crossways crossways cross- cross ways was of the building Back of the library is a large storage room for various various goods and equipment belonging belonging belonging be be- longing to the city The fire department is housed on the south side of the building bull ling with witha a large room for the truck and a shower bath room for the men when they wish to use use it The floor has a drain in it so that the truck can be washed after each re return return return re- re turn trip and all equipment kept clean A linoleum tile floor has been laid throughout the library reading room and the clerks clerk's office and that will be finished today There remains connecting up some of the plumbing and placing the new florescent florescent flor- flor light fixtures and then the building will be completed and turned over to the the city |