Show Thornt Thornton ornton a n Drug rid Completes Completes' Their ear Store Remodeling The Thornton Drug Comp this week the remodeling and and redecorating of their Delta store The work has been und under r way for or past three months and is done for Christmas season The biggest part of the job was the addition of about square ft of floor space which was accomplished by removing removing removing ing the partition on the north northend end of the former store and using the room there The prescription department department department de de- was put in the east side and the new addition gives th the store another entrance to the west by the postoffice and two display windows Some new cases and cabinets were and the entire store I has has' been redecorated with paint and wall finish Venetian Veneti n binds are on the windows and new floor covering cov- cov cov covering ering ng was put in throughout Abig A Abig big Neon sign was wa placed on the south and west fronts of the building buildIng building build- build Ing and completed ted tile the project r |