Show Lynndyl Irrigation Being Repaired Work Vork commenced on April 2nd at Lynndyl to make replacements of feet of the Lynndyl irrigation Wendell Vendell Paulsen assistant district engineer of District No 6 WP WP W W. PO P P A. A was in m Delta on Tuesday to get the project under way The project will cost and isto is isto to to be of reinforced concrete The origInal original inal installation was of untreated continuous continuous continuous con con- pipe and was put In under the direction of Leland H H. KImball Kinball twenty-seven twenty years ago Sixty-six Sixty men are employed on the work camped in m tents near the job The men are from Meadow Mcadow Holden Fillmore Scipio O Oak k City Leamington Leaming Leaming- ton and Delta Leland C C. Callister Is the engineer in m charge of the con con- |