Show SCHOOL BOARD TO INSTALL JOHNSON HEAT the now tic high school building nt at i manti anil abw 1 the tile now low school t nt it mil Ala field flold mill lave na its nn all important liiri 0 of their beatin he atin eyet tIns uius tile cicat control huch esus as tine tile decision of tile school board in lit their refill ir meeting last saturday tho linit control 1 in fit ifill lost cost 1300 ami and th tint it nt at Ala mathold Mat lold flold 00 tile those systems alro not provided for in the tile contracts for por a time part of 0 the bo ml ird members waro opposed to therit A ln of held in ill hold held in ill ola bechs jy aro to do teri nine hat action lilt lien would tako in fit rt it 11 I 1 to tit alic ih installation of tho via liast control audgo woolley loy dr 0 L 1 seara and 1 I 1 voorhees were appointed as a to walto walte on oil tile school board and urge them to to install tha estem tacio men mot met with tho board tho the next day and urged tile economic and necessity of some hat control 1 idys teni tem tho the board took tho tha matter under advisement until the eting last saturday han tho tile order was issued for their installation tile johnson Jo linson heating control ie Is a hlll ashin ll automatically lati and controls lont tont rols tho tile licit in each of af tho tile rooms of tho the building it the room becomes too warm automatically mati cally tho the radin radiators tors are closed lon flown and tho the room off while white on all the other hind should tho tile room too cold the radiators aro are automatically olad d tho tile drafts for the furnace ire opened until the tile pro per Is secured it 1 it l claimed that tho the system will pay for it olt in a faw years in the amount of fuel it will save |