Show site for city reservoir R changed cha aged on 0 n excavating qt at the propose site elta or for the noy now gallon tait b city avater aw it kasij waa found a 0 airing or seep was wal 9 en elijoh la is tp to have bidou causo cause by the water escaping train tile tha old reservoir it liaa haa been necessary necea sary to TOMM remove tile the klo elo 0 t the voIr northwest from 00 in tho the first proposed site alto work la Is underway derway un to tile the earth from this location to have solid ground on which to huud build tho the reservoir A 61 enable crew is working north of annab ciar race haco track on this project |