Show KANAB HANAT SIDEWALK PROJECT UNDERWAY CONCRETE BEING POURED pouring of concrete was star started tied tills lis week in kanab as a the project calling for a nille mile of sidewalk along the highway through town again got underway after working only ona bno day last week due diio to inclement weather A concrete con creto side sidewalk walkIs Is called for in th the e project projects i and the first oathia of this was wait started this week along the south side ilde of the church block while the continual rainfall for a few days hampered the excavation work it la is thought that the concrete can all be poured immediately providing additional addition tion al moisture does not make the sand at the gravel pit too damp to screen As aa soon as the work on oil the church block finished la is the crow craw of 28 men will begin t tor for the sidewalk 0 on n th tha block lust just east cast running affa as far r as the parry lodge I 1 while tile the entire project may not be completed complete dat at once it calls for the laying of one mile mild of sidewalk along one side of the street and will extend the entire length of main street tho the state road commission to s cooperating with the city in sponsoring the tha project |