Show north ward begins beautification remodeling of chapel this week W eek volunteer members will begin with root boot today priesthood members of the kanat norta ward met tuesday evening and prepared pared plans for licausi flea tl cation tion of the ward chapel the meeting was called by bishop daniel 8 frost and 16 15 members were ware present work begins this morning by tearing mocho old shingles and laying dewones new ones tor for a com complete now new root roof A complete check of the building has ha 9 wen been made and improvements 1 and na remodeling to be in eluded aro are corn complete plot painting pain ti tig up tirs and downstairs down stairs hot water se separate krom the naco much needed fire proofing ot 0 tur nace room and now new valves tor for the rd latora to stop atop the steam song every sunday naghi shrubs and lowers flowers will 6 oe e included for the outside noonday onay painters will be liere here to begian the painting of the chapel painting woodwork walls wails floor and ceilings will bo be done by the ward members Oom complete plato lighting 7 fixtures will be put in and windows will bo given screens and insulated against weather seeping beeping of water into tho the basement will be checked and now rain pipes will be put anthe building tho the font in the basement at the chapel wll will bo be shed i at AI the hie meeting complete ti cation 0 of tho the block was discussed disc used plans have been drawn up orthea work which will come after tho the beautification of tho the chapla chaple Plans drawn up by the church includes a play ground and tennis courts tor for the beautification of tha blocked honses will bo be shared by the ward and tho church all members of the ward and any others that are willing will be solicited to with the labor and with expenses pledge cards will be passed out ant on which asked the amoun twilling to bo be paid below Is a reproduction odthe of the card |