| Show SEMINARY BUILDING UNDER WAY 4 work on the new seminary building in kanab started the first ol of the week last tuesday eight men were busily a work excavating for or the basement go eo the foundation can be laid at once the building will be built of native red and white stone from mariger canyon east ot of kanab it will be a substantial unique building about 40 4 feet by 28 feet with a halt basement and will be ba one story high on the ground floor will be a class room an office and a store room there will also bean be an inside basement way leading down into the basement where LL a furnace TV til bo install ad besides the men who are at work excavating there has been a crew of men at mariger cany cc nyi i all w ek quarrying the rock for the building euid and another ere ware burning lime the committee in charge expect to have tho the building completed by next september who the school opens rach each family in bonab will he be expected to donaa 3 either work or money amounting to 1000 towards the erection ot of the building there are about in kanab who wh will be beneal el ed by this building and should donate fils 1 luding it the building committee consists ot of william rust kust delbert riggs walter mcallister with charles charlea R pugh and israel chr mcerlain mb erlain as advisory ment mem bars |