Show New Bridge to Be Constructed South of the City A new bridge of reinforced concrete is to be constructed over the breakwater channel at the head of Main street to open directly di-rectly on the street running south between the Henry and Vernon Heap property on the south edge of town. The bridge will replace the old wooden footbridge at that place and will be wide enough for vehicular ve-hicular travel. This will make it possible to travel the street without with-out crossing the highway bridge and then making the sharp turn to the east. The State Road department is cooperating with Parowan city in furnishing the cement for the bridge and when it is completed will probably close the gap in the guard rail on the south side of the highway bridge. This will force all traffic to the Heaps property over the new crossing. |