| Show new coal road to be built just vill bo be the cost of construction of a coal road which is to be built within the next sixty days to carry coal from the mines of the standard coal company to storrs the contract has been let to the L R wattis construction company of salt lake the road will extend for two and one half miles from storrs which is a station near helper with a narrow gauge tramway covering the mile intervening between the end of the road and the mine the standard Stan daid coal company was incorporated early in june with capital F A sweet is president and L P F rains george payne F 11 francis james H moa a ie le 0 N sweet and J H riddle are officers mr rains also being manager B H blossom Is s consulting engineer of the company and fred jacobs engineer in charge the company expects to have its first coal on tho the market in the fall of the present year its product is known as the castle gate coal loal F A sweet sas that lt worth of machinery is to bo be install installed cd its ito coal properties cover about 1000 acres and were purchased by mr rains last winter inter after the coal is brought C to helper it will be shipped over the denver rio grande |