Show S S Ness Ness' field Schedule The rise Salt Lake Route will Institute a n new w schedule of or Ilas passenger enger train l er e between cen Salt Lake nn and Garfield Garfield Gar- Gar field August 13 13 on account of or th the opening of oC the new smelter Trains will leave lea Salt Lake Lae at 7 a. a m. m and 3 and I 11 1 I p. p m. m Returning trains will Ill leave Garfield at nt 83 8 33 a. a m. m 51 p. p m m. m and anti 12 1220 20 a a. a. a m. m The trains make the time therun run each way war In 40 minutes |