Show MORANS MORAN'S BID IS 15 ON SEWER SEVER Contract Is Held Up Until an Investigation Can Be Made DELAY MORE WEEK Another Order on Contractors to Rush City Creek Aqueduct c Two bids 1115 were received b by the city board of or public works at Us Its regular meeting Friday night on the work or o putting In the time Intersections In the North orth Temple at the tho In Intersections In In- with West Yest Temple First I West est and Second West Vet streets Time The bl bids s came caine from Zerbe Walker and P J J. J Moran They gave n ures on the different portions of or the thc work being as follows Zerbe Walker Excavation Excavation and back hack filling n a cubic yard con- con concrete 1850 a cubic yard furnishing furnish ing log reinforcement 10 cents a 11 pound Constructing rip rap in channel 1 I a n. square yard plaster whore where needed 1 a i square yard P P. J J. J Moran Moran Excavating and back backfilling Tiling filling a cubic yard concrete 15 a x cubic yard furnishing reinforcement reinforce m mont ment nt 5 51 cents a n pound constructing rip rap 2 a square yard ard plaster 73 75 cents a square yard The Time total amount of or tho the bid of Zerbe fc Walker Is la about and that of or Moran about Tho fhe tto late on the time work was about The city engineer announced that both bids appeared appeared ap ap- ap- ap leared to he be somewhat high bight and he I wished to look Jook Into the matter On motion of or W. W J J. J It wa was decided to In lay hay the bids over for a week n to come commie up tip next Friday when bids are tHe to be le opened on the ra In paving jf of n a portion of West cst Temple anti and Fifth FIrth South streets The rime city engineer will the time bids In the tIme meantime A large number of estimates on curb and gutter Jutter extensions water main extensions and sewer extensions were approved Among AmonA the communications re- re elved ed from time the council was the time one Instructing the board to notify Davis Davist t the contractors on tho ho North Temple street aqueduct to proceed their thell work within two days or o ha the time city take the work out of ot I their heir hands T. T J J. J Armstrong said the mayor nayor had expressed a desire that the time board oard send end time the notice and It was wag decided de do- to do 10 this as It Is sal said there thoro Is Isa Isi isa a i great reat deal of at work the contractors can an do without Int Interfering with traffic fic ic during encampment week w It |