Show LEGAL NOTICES i TO rn 11 U En STATE ENGINEERS ENGINEER'S OFFICE SALT ALT Lake Cl City Utah Juno June Junt 22 1903 1909 Notice Is hereby given ghon that the tite tit Provo Reservoir company compan b by its Is dent dont Joseph R. R Murdock whoso whose po postoffice post post- t- t office address Is II Provo Utah has hns made application In accordance with wih tho the re requirements re- re of oC chapter Session of Utah I 1905 O as os amended h by bythe bythe the Session of ot Utah Utah ll 1007 07 to appropriate ap tip- two to hundred nine nino feet acre of or water from front Provo Prove river dYer Utah count county Utah ULah Said Sall water will willbo wil wilho ho bo stored whenever lr ava avaIlable during tim tho period from rom October 1 I of or each cacti year 1 erf of fol rol oh- oh until July Jul 1 I 1 In Inclusive tho the year lowing In Haystack Lake ako No 2 situated situ sItu- on land In th I tah tab Forest Reserve near nour the thc head of or said lorest stream Tho center of or the dam dar I which Is to he 10 ht built buit at the thc outlet of I Isaid said saul lake hake e IB he at al n a point which h hor hears ars south 49 degrees degrees west about ZO 9 r feet 1 I distant from Crom the United States government go gov go monument located on Mount I IBall Ball Baldy Tho water so stored will wi be released from ron sold said reservoir during the tho period from Jul July 1 to October r 1 I In Inclusive In- In elusive of or each caCtI yen year and 0 allowed to How down tho the natural courses of ot streams below said lake hake to a point on Provo river which bears bours south IS 18 de degrees dO- dO d.- d. I grees grecs 62 minutes west 1520 feet distant distant dis this tant froTh from tho tue west quarter corner of oC section 5 G township 6 G south ran range e 3 east Salt Lahce base and meridian from Crom where shero It I will wIl be bo conc conveyed cd for Cor a distance of or feet In t a pipe line lne and a canal canal and antI there theme thelo used in to Irrigate Irrigate Irrigate gate acres of oC land In sections 25 6 to 36 26 township 1 I range 1 I cast east sections 30 0 0 31 and ond 31 I township to 4 south range 2 east sections sec sac tons 1 to G 6 Inclusive township 5 I I south sath range 1 I cast sections 4 to 10 10 Inclusive J I 14 I 4 to 23 23 Inclusive 26 to 29 Inclusive 3 32 to 35 35 Inclusive township I 5 S south ran range e 2 cast est sections t 1 l t to 1 4 Inclusive 9 to 16 Inclusive e 21 1 to tt 24 I Inclusive township 6 G south ran 2 cast elst and sections 6 G and 7 7 township 6 G sou south th range 3 cast east Salt Sal Lake Loke base bas and meridian This application is designated In ii tho hue state engineers engineer's of of- lice fee as No m. 2077 All Al protests against the granting of oC said soll application stating the tue reasons must bo be made by affidavit In duplicate and flied filed fed In this office within I thirty 30 days das after the tho completion of ot the th publication of ot this tiis notice I CALEB TANNER ANNEn State Stale Engineer er Date of o first publication June JulIe 2 1 1909 date of o completion of ot publication ion tion ton July 26 1909 NOTICE TO 10 0 STATE ENGINEERS ENGINEER S OFFICE SALT I Lake City Utah Flail Juno 2 22 1909 Notice Is hereby given that th the Provo Prove Reservoir company campan by Its Is presIdent president preal- preal j dent Joseph R. R Murdock whose postoffice postoffice post- post i office address Is Provo Prove Utah has made application In accordance with wIh the re requirements requirements requirements re- re of or chapter lOS Session Laws Law u s of or Utah 1905 AS amended b the Session Sea Ses 8 sion slon laws I of oC Utah 1907 to appropriate I ate ute two hundred thirty reel feet of oC water from from Provo ll er river Utah count coun coun- I t ty Utah Said water will wil bo tie stored I whenever available during the period i from October 1 of ench each year car until July I 1 I Inclusive of or tho tile year following In Haystack Lake e No 3 situated on un- un I surveyed land and In the Forest lorest Reserve near neal the tile head hend of or said i stream Tha Ph t i f f i 1 l i.-l 1 Vl trEal I 10 o f tn ti n f be built Ili bu at i the tle outlet t ti of said d lake ak is i Is I at a point which bears bers south 49 41 degrees de- de I grees grees 40 minutes west about 5 1935 feet reet distant from the United States government monument located on Mount Baldy Tho The water so 80 stored will be released from Crom said reservoir I during the period from frol July 1 to October Oc Oc- October Oc- Oc tober 1 1 Inclusive of or each year and allowed to Mow flow fow down the natural I courses of streams below said all lal lake c. c to toa toa a point on Provo river which bears hars south 48 IS degrees 5 52 minutes west 1320 feet distant from rein the west quarter ter tar corner cornor of or section 6 township 6 south range ranse 3 east cast Salt Lake Lako Lak base and meridian from Crom where It I will wl bo ho for Cor a distance of or feet reet In n a pipe line lne and a 1 canal and there used to Irrigate acres of ot land i embraced In sections 25 to 36 In ln 11 In- In I I J sive alve township 4 south range 1 I east i sections 30 30 31 and 32 township 4 I south range e 2 11 east cast sections 1 to 6 i Inclusive township 5 south range 1 I I cast enst sections 4 to 10 inclusive 14 1 to 23 Inclusive 26 to 29 29 Inclusive 3 32 to 15 35 Inclusive township 5 6 south range 2 cast sections 1 to 4 Inclusive 9 to 16 16 inclusive 21 to to o e township township town town- ship R ft e south uth range 2 east and anil In 1 sections 6 G and 7 i. township to 6 south range 3 cast east Salt Sal Lake linac HaHe and meridian This application I t is designated In the state on engineers engineer's office as RS No 2077 n 2077 no noAl All Al protests a against tho the granting of or said application stating the tile reasons must mUt be made by affidavit In I I duplicate and ancl tiled med In this tills office within I thirty 30 20 days after the completion of oC the publication of ot this lila notice I CALEB CALED TANNER TANNER State Engineer I Date of ot first publication June 25 1909 date dale of or completion o-f o publication July 26 26 1909 1 To TO 0 t IUS STATE ENGI ENGINEERS Ian OFFICE SALT Lake Cf City Utah June 22 22 1909 Notice Is 1 hereby given that tho tim Provo Pro Pro- vo o 0 Reservoir company compan h by Its Is resl- resl dent Joseph R Ti Murdock whose postoffice post- post office address Is Provo Utah has made application In accordance with wih the requirements of oC chapler chapter lOS Session Session Ses Ses- sion law LaWs aws of or Utah Utah 1905 1005 a as aM amended b by the Session Laws of or Utah 1907 to appropriate one hundred seventy five se ent and ond tenths nine 1769 1759 feet acre of or 0 Water ter from l rh r I 01 v h. h Utah Ulah Said water r- r will Ji i be st str stored r d- d whenever when when- ever available a during the tho period from tram October 1 of each year car until July I 1 1 Inclusive lve of or the year car following In Washington Lake No 2 situated on un- un surveyed land hand In the tile Uintah Forest FOIst reserve ro- ro serve Ilear the hue head hOl of or said ail sall stream The center of thc hue dam darn which Is to bo be built buit at nt tho outlet of ot said lake Is at a point which bears hears south degrees degrees de de- grees west about feet Ceet distant from the tho United States government monument located on Mount Baldy naldy The Tile water so stored will wi bo be released rein from said reservoir during durIn the period from Crom July 1 l to October 1 Inclusive of each tach year ear and allowed to lo flow Cow own down the natural courses of or streams below blow said lake to a point on Provo 1100 river which hears bears south 48 degrees es 6 5 62 minutes west est 1320 feet eat from flom the west vest quarter corner cOIler of or section I 5 r township 6 G south range lange 3 cast east Salt Sat I 11 11 vase ac Ul mOIl lan trum it iton I iL wil be conveyed for a distance of oC on A foot feet In a pipe line lino lne and n 0 canal and there thero used to Irrigate OOOO acres of ot land embraced In sections 23 25 5 to 36 inclusive township 4 I south range 1 Cast ast sections 30 0 31 and 32 32 township 1 I 1 south range 2 east sections 1 to 6 6 Inclusive township S south range 1 I east sections 4 to lo 10 10 Inclusive 14 1 to 23 Inclusive 26 to 29 29 Inclusive 32 to 35 35 e. inclusive township 5 S I south range 2 cast east sections 1 to 4 inclusive 9 to 16 16 Inclusive 21 to 24 4 inclusive township to 6 c south Bouth range i-ange 2 east cast and amud nul sections 6 and 7 7 township 6 G south range 3 east cast Salt Lake base baso and inert meri 1011 than dian This Is application designated J In time tho Engineers Engineer's office as ns NoAll No 1 01 i. 2077 All 1 protests against tile tho granting of said sall application stating tho the reasons must be made mado mode b by affidavit U In IT duplicate and flied filed tied In this office within thirty 30 1101 0 days os o's after aCer the tho lie completion o of oC the publication of or this tIIa notice CALEB CALIB TANNER State Engineer Date of oC first publication hao 2 25 1909 elate date of completion of or o ion tion lon July 26 1909 I TO II H US STATE ENGI ENGINEERS ENGINEER'S n EH'S OF OFFICE ICE SALT Lake Lako City Utah Utah Juno June 22 1909 Notice lI Is imi hereby given Iven that the Ito Pro- Pro o o 0 company compan by Its It president dent dl Jos Joseph R R- Murdock whoso postOffice post- post I Office address Is IK Provo Utah has made application In accordance with wIh the re requirements rc- rc I I of or chapter Session clon Laws of or Utah 1905 as os amended d by the tile session Lass of ot Utah Ulah 1907 to appropriate ono one hundred three seventy 73 feet acre o of water sater from Provo Pro river Utah ULah count county Utah Said water will viii hi lo stored scored whenever available a during lurIng wt me time period from October 1 of or each ench year until July I 1 i. i inclusive of or the tho year car following fol rol- fol- fol i lowing in Washington lake hake No 4 situated sit sit- 81 minted on ced land In the tIme Uintah Forest reserve near the head Of br said stream Tho The center of oC the dam dali which Is to be built buit nt at the limo outlet of ot sa said II lake Is at ot a 1 point which boars bears south 76 de- de groos 45 minutes west st about feet reet distant nt from rota the time United States Slates government monument monument located on Mount Baldy The Tile water so stored will Bald 10 wi be bo released from Crom said aid reservoir during the period from June 1 to October 1 l. l inclusive of ot each year ear and allowed to row now flow down tho the natural courses coures of or streams below said lake Jake to a point on Provo river which bears bear south 48 8 degrees de tie- grees Arees grees 62 52 minutes west 1320 feet distant from the tho west wet quarter corner of or sec see ton tion 5 6 township 6 G south Houth range 3 calt east cast Salt Sal Lake Lako base baso and ad ard meridian from tram LEGAL NOTICES where It will wi bo be convoyed for tor or a distance of ot feet In a n pipe line lne and a canal and there used to Irrigate acres of or land embraced in sections 25 26 1 to 36 Inclusive township 4 south ran range 1 east sections 30 31 and auld 32 I township 4 south range 2 east cast sections sec see Lions tons 1 to 6 6 Inclusive township 6 5 south range ranga 1 east cast sections 4 to 10 Inclusive 14 to 2 23 23 Inclusive e 26 26 G 27 7 28 9 29 32 to 35 Inclusive township G 5 south Bouth range 2 1 to 4 In Inclusive In- In elusive 9 to 16 16 inclusive 21 to 24 4 Inclusive township 6 south range 2 east and sections 6 and 7 7 township 6 G south ran range e 3 east cast Salt Sal Lako Iko base and meridian This application Is designated des ties In the tile State Engineers Engineer's office as No 2077 k All 1 protests against time the granting of o said old application stating staling the tile reasons must be bc made mado by affidavit In ill duplicate on and filed In Ill tillS this office within thirty I C 30 days das after acol tile the completion completion com corn of the publication of oC this notice CALEB TANNER State Slate Engineer Date Dale of or first publication June Juno 26 25 1909 date of oC completion of ot Lion ton tion July 26 1909 NOTICE ro TO ut trl nu STATE STAE E ENGINEERS ENGINEER'S OFFICE SALT Lal Lake c CI City Utah June 22 1909 Notice Is hereby given that the Provo Provo Pro Pro- vo o Reservoir company b by Its Is president president dent Joseph R. R Murdock whoso whose postoffice postoffice post- post office address Is Provo Utah has ban hal made application In accordance with wih th tile the re requirements rc- rc of chapter lOS Session Laws of or Utah 1905 o as amended b by tho tile Session Laws Lans of or Utah 1907 to appropriate one hundred twenty four and tenths nine 1249 29 feet acre of water from Crom Provo river Utah county Utah Said water will be bo stored avaIlable during the perl period oJ from October October Oc Oc- October Oc- Oc tober 1 of or each year to Jul July 1 I 1 Inclusive Inclusive sive of or the year ear following In Washington Washington Wash ash ashIngton ington lake lako o No ro 3 which Is situated on land In the Uintah Forest Forest Forset For For- est set reserve reser e near tho thuc head of sard sar I stream The center of ot the dam darn which Is to b bo bl built buit at a the outlet of oC said lako lake Is I at a point which bears south 70 degrees west est about feet set distant die dis that tant from rein tho tile United States government government govern govern- ment mont monument located on Mount BoM Baldy The water BO so stored atom will wi bo ho re released re- re leased from said reservoir during tho the period from Ju 1 to October 1 1 In Inclusive In- In elusive e of oC each ellch year eor and ond allowed oll alo to flow fow down the tile natural courses of oC streams below bolow said lake to a n point on Provo river bears benn south louth 48 4 do- do I grees rees a minutes west cst 1320 iau teet OLe dis tant tact from the west vest quarter corner of section 5 5 township 6 south range 3 east cast Salt al Lake Lako base baso and meridian from where It will wil bo be convoyed for tor a distance of ot feet In Ill a pipe line Mno lne and a canal and there used to acres of or land embraced In sec Hec- lons 25 G to 36 Inclusive township 4 south range 1 east elst S sections 30 30 31 and 32 32 township 4 south range 2 east east- section 1 to lo 6 6 Inclusive township 6 south ran range o 1 east cast sections 4 1 to 10 InclusIve 14 H to 23 23 Inclusive 26 to 9 29 9 Inclusive 32 to 25 Inclusive o. township 5 south rall range e 2 east cast sections 1 to 4 Inclusive nc us ve 9 to 16 1 Inclusive o. l 21 to 24 o Inclusive township 6 G south range ramie cast east and sections 6 and antI 7 7 township 6 south range 3 east Salt Lake base and meridian This application la is d dos des H I In the tho Slate Engineers Engineer's o office ns as X No so i. 2077 j. 07 i JAll J ce All Al protests against the saul said application stating the granting reasons reMon of or for must bo be mado b by affidavit In duplicate cate anti and filed fied In this office within thirty 30 dR days S 'S after tile the corn com or of tile the publication or of this notice CALEB TANNER TANNEn State En Engineer Date or of first publicatIon Juno 25 25 1909 date of 10 completion ton Ion July Jul 26 6 o 1909 ot of |