Show WORK ON BIG HOTEL TO COMMENCE IN EARNEST From Proul n a Trl Trip 1 to lime lie nt OperatIons Operation Will lip lIe Samuel returned Sunday I Inight night from the En Hast East t. t after a two weeks week absence on connected with the theS S hotel and other projects project with will which he Is connected lIe He returns with the 8 assurance that work worle on a wholesale plan Ian Is to begin at the site of the great hotel at Fourth South rind and Main streets and will continue continuo continuo con con- without further Interruption The contract for tho tIme steel work will belet bo be bolet bolet let this thin w week ck nn and it is thou thought ht this the steel material will be on all hand b by the time lime tKo the excavating has been com corn pie t eI Mr fr reports a healthy re resumption resumption re- re of business s throughout tho the Ea East t |