Show COLUMBUS SlOPE VS SHO SONLY ONLY ORE The Limit of Shipping Product Is Sounded in No Direction That the Columbus Consolidated company's mines at Alta AHa Is opening larger as work progresses and that production Is being made mado at a tl rate nto which must soon toon place that company compans' In easy circumstances Is tho the story told I b by C. C W W. L. L Stevens and Ro Roy Hem Bernis Is who returned from camp yesterday esterday af after after after af- af ter having been shown through the Columbus properties b by Superintendent A A- AO O 0 0 Jacobson Mr Bemis Bernie is a mining engineer of oC known conservative principles principles prin prin- whose whoso statement of or conditions In the mine will be regarded of oC value On On the way woy to camp campo ho lie said yesterday yes les es we met 14 heavily loaded four- four horse ore teams and wo we were In Informed Informed informed In- In formed b by the tho checker at the Pioneer sampler that 3 35 teams are arc now era cm- hauling ore from tho Columbus mine and that the tho average brought down Is fully SO 80 tons a L Lda da day We e were further Informed that this ore nets netH the tho company about 23 a ton Tho road from the loading station at Tanners Tanner's Flat is now In good condition Three shifts are working In tho mine In the west drift on tho the level where all of or the ore Is being taken out a has lIas b been en opened which Is 14 H sets of timbers In height hl six sets wide and 14 H sets long IonS Theore Tho The ore Is all of shipping grade as It le Is broken down jt occurs on a contact between white and blue lime near the tho Intersection of oC a fissure cross with tho the contact No Xo of Ore In Sight The Tho ore oro seems scorns to bo be going out along tho the contact strong at both ends of ot the the tho quality being tho same as that In tho slope It Is 18 difficult dif dif- to estimate tho tIm amount of or oreIn oro ore In sight If the ore Is continuous between between be bo- tween two points where It has been opened on the tunnel about It give about feet teet on the strike It extends as na far as the slope goes and there Is no sign of Its pinching above or on either cither end The Tho east drift on the tho level le Is following a fissure which has hns a strike about at right angles with another contact contact contact con con- tact ta east t of the tho from which theore tho the oro ore Is being sloped Considerable water Is making In tho the face of the east cast drift and work worl has been temporarily temporarily temporarily tempo tempo- suspended pending tho the Installing of or a largo large pump It Is expected to cut the contact about 50 O feet ahead of ot the present taco race of oC the tho drift Another drift eastward on tho the tunnel tunnel tunnel tun tun- nel level above Is Js on a nice fissure and andIs Is due duo to cut about 40 feet ahead tho the contact from which above that level considerable high grado grade oro was taken hut which was cut off ocr by a a. fault Tho The I brea breast t of or that drift shows two seams scams or of nice ore with about two feet of ore on either cither side aide Mining Notes Noted otell Directors of tho the Dern Dora companies companies- Uncle May Day and Lower Mammoth Mam Mam- moth will moth will hold their monthly meetIngs meet meet- ings lags today Ore at ot Samplers Sampler Oro Ore receipts by carloads reported yesterday uter ay by the samplers Taylor- Taylor Brunton Utah Brunton-Utah Utah 16 10 Nevada No 1 1 Pioneer Plo Pio neer Utah fleer Utah 5 6 Idaho 1 |