Show TINTIC DEVELOPMENT IN ORE ON LEVEL Y J Ip 1 Jn raising 20 o fp foot feeL from th the tho drift on tho tho foot 30 level the E East Ht Tintic Development ne nt company compan has opened opener a ahod hod hotly body of oC ore are Oe from eight toton foet feet wide according to word which came caine yesterday yesterday yester ester esteria ia day from tram camp Tho The oro OTO 10 Is belev believed d to bo be tho downward continuation of or that encountered In the cavo cave and 60 feet below the cave or about feet tho ho 30 level lewel The drift east- east ward vard on the second level 10 Is nearly neally duo to catch the largest ore vein In Inthe inthe the tho property nb about ut feet from rO the haf hafL The shaft las 8 reached tho the depth of feet teet and a a drift Is being I sent ent out to open the ore zono zone from that 1 J level 1 |