Show CONTRACT IS LETIN lET lETIN IN STREET WORK VORK P. P J. J Moran as U Usual ual Is Given the Job of Resurfacing Main Street and Doing Other Work on th the Thoroughfare Members of tho the board of or public works at their meeting Friday night awarded a the contract for tho the resurfacIng Ing of or Main street between South Tern Tern- pie and Fourth South streets together with tho the work of ot and tho the thoroughfare for Cor this distance die dis- tance to P P. J J. J Moran on his bid o ot of which Includes tho the cost o of oC t taking out tho stone paving blocks to tobe tobe tobe be used b by the city In cross walks Moran was the tho only bidder on this work as ns well weB as ot on that of or Third South street between West Temple Temple Tem Torn tile and Third West Vest cst streets The contract contract con con- tract for Cor paving Third South street was not warded awarded b by tho the board going over o for a n. week together the contract for the tho stone cross walks walk In various parts of or the tho city The board awarded a contract to J J. J W. W Mellon Mallen for tho the grading or of Fourth North orth street from East Capitol to drive the tho contractor to to purchase purchase pur- pur chase gravel el and other material talen taken out Motion will pay the tho city 1301 for this work It was decided to recommend rec rec- to the tho city council that A street between Fourth and Firth Fifth avenues ave R bo be graded under similar condItions condi condI- Lions Several Sc estimates on work done dono were svere presented for lor approval al On the tho final estimate In favor of or Shea hea Anderson for tor a concrete conduit on thu tho Suit Salt Lake Lalo canal north of or Mill l Creek the amount duo tho the firm was although thoro thero was a penalty against the firm of or for Cor or of 21 days In tho thu completion on of or the tho work at 26 5 a ada da day It was decided to enforce tn tn penalty and this amount was cut ort off the estimate There Thoro was waR a final estimate In favor of or J. J D. D on water main extension extension ex ex- tension No o. o 22 In PIerpont street stroet be between between bo- bo tween twee-n twe 11 Ninth and Tenth East streets tor br 1011 S There was u a forfeiture of ot three jays duyn at 10 a n do day but who was waa present said Balli ho had been ordered to stop slop tale work worle b by the board and the hoard board did not enforce this pen pen- nit alLy alty Tho The following estimates also were wore approved Third partial estimate In favor of James Kennedy Kenned sewer extension No 17 72 fourth partial estimate In n favor tn of or James Jamel Kennedy Kenned sewer extension extension ex- ex tension No ISO The flue board decided to advertise for forbids forbids forbids bids on the following street paving bids to be opened Juno iS 18 IS Street pavIng paving pay pay- ing extension No 48 Eighth South between between be bo- tween Main and State street paving extension No 65 55 First Vest West between South Temple Templo and Third South street paving pavIng- extension No 35 35 State street he between tween Seventh e South and Ninth South streets |