Show NEW NE RATE IN SHIPPER Western Pacific Schedule Starts Up Ely Silver Lead Lead Siver Producer Tho freight schedule which has gone sone into effect on the tho Western railroad has hos already had tho the effect of ot bringing In a t new silver load load oro ore shipper to Salt Sl Lake Lako smelters from Ely district Tho The Ely Hidden Treasure Copper I lies between company whoso whose les those of ot the Nevada Novada Consolidated and Cumberland EI Ely owns own ono claim from which considerable production of lead- lead silver oro ore was Wl made mado malc before th copper copper cop cop- per excitement in that district was started With rj the thA better trel freight ht schedule In force tho the mining of or that ore again becomes and a alease a lease has he been taken on tho the lead sl lead sli ver er workings by the Leasing Lensing company compan A force Coree of or men Is to be placed at work worle to clean cloan out the old shaft shaf and get the tho property In shape for Cor extracting ore The Tho working of ot tho lease will wi not Interfere with the Hidden Treasure company's compans plans for extensive development development el de devel devel- of ot tho the bodies bolies of copper ore which have IUle been discovered In other claims of ot its group |