Show fALENA ALENA ORE TO fO O I TUNNEL Connecting Shaft Shaf With Niagara Bore Is Engineering Feat Feat In th the completing connection a day or two tw two a ago o between the Niagara laSara tunnel tun tun- nel net owned Jointly b by the Silver Shield an and tho tim United States companies and the tho Galena shaft shat workings of the United States company an engineering feat S1 tull fully equalling equaling that performed In Ohio Copper was waH accomplished said Harr Harry S. S Joseph yesterday The Tile work was done under tinder supervision of or tho the Silver Sil Sil- Sil ver Shield company and tho the survey Siver Si- Si for th the was made by J J. J Fewson Smith of or the thc United States company's I engineering staff The he mouth of or the tho Niagara tunnel is fully uBy two miles from tho the Galena Calona shaft aid the point to which an upraise ahat of ot ur 4 feet was sas to be bc driven from the tun tun- I nd nel nl level had to be bo reached through a aI tortuous 8 system of or drifts from the tho I shaft haC And yet tho the survey was wan per por- ferto feet the tile upraise having been driven straight to the desired point without the variation of ot the tho fractional part of an Inch The Tue connection will wil make aRe for tor great great- ly 13 Increased economy in handling geat- geat the ores from the tho Galena mine Tho Tile ores orea wilt will bo be dumped to the Niagara tunnel level and taken out IJ by tho tilO electric haulage system Ore Orn ut r I I Are receipts b by carloads ds reported yesterday by hy the tho samplers Pioneer Pioneer- Pioneer Pioneer-I Utah Uth 3 Taylor Taylor-Brunton Taylor Brunton Utah 10 I flutter nu oud l Eggs Chicago o. o Harch 25 Butter Butter Firm Creameries dairies 19 E Eggs Steady Eggs Stend a-Stend Steady at mark cases c in In- In eluded firsts Jh lAc 1840 prime 1 Itie Chees Firm Daisies lIe o twins Young Americas 0 long lonG horns |