Show MILL It nu EUN ON FOR FOIl UCHOn Lot TAt of Tons 10 o Go Gu Through h ZUn Plant With tons of ore in tho the new bins bIn and amid a continual stream ant of or oro ore coming from om the north and und south drifts on tire the foot level hovel the Buckhorn management man man- has ha arranged for tor a big mill millrun millrun mJ run at tho the Mazuma azuma Hills Ifs mill mi und and are awaiting the 1 oro ro teams ar to lo convey the product to the tho mill Thomine Tho Thomine mine management has been ready redy for fot several te days tays for foi the mill mi run and the tho theore oro ore will In all al probability bo be bf on the tho way to its It destination before otora another L' L Lda da day pa passes by Tho The Buckhorn management man will win be In a position to furn furn- urn urn- ish Ih practically an unlimited amount of ot ore as al the vein is I showing decided d Improvement as a the te drifts advance on 01 the tho ore Lod body It is bellied that at I ed beJ t tons will constitute the wJ present pre pre- pres pres- ent run Seven S Seven ven Troughs Miner |