Show TiNTIC NEW V S SMELTER fEL TER TERIS IS DOING THE WORK VORK Two Lead Furnaces Turn Out 40 Tons of Bullion Bulon a Day Two lead furnaces of the tho to Tin Tintic tic smelter are now In commission They are arc turning turning out about 10 40 tons of or bullon bul bul- lion lieu lon a day an and according to Constructing Con Con- Engineer Howard P P. Saunders Satin Satin- dora ders lers who came care in Iii from the tho camp yesterday yes yes- everything o is running as smoothly 03 as a could be he expected expect expect- ed of a new plant The Tho two roasters In commission are arc also treating 35 and 40 tons toils of oC ores every day and ant aro doing fine fino work t Tho The copper coppel furnace Is ready for business with wih tho exception of oC being connected up with wih tho the blower there thero having having been delay in arrival al of or the blast pipes It I may ho bo two or three w weeks eles yet before connections will wf be bo made so that tho tIme furnace can be lo blown in iii Steel h eJ for tor the tIme new bl blast t furnace building is Ig arriving on tho ground and con construction will sill wH be he started during the week Grading for tile the sulphide mill milland mi and und the new roasters is in progress and material for tor the now new sulphide bedding system stem is ison on on the way Th The ho enlarging of tho the smelter to three times the tho capacity ty contemplated l by the original plans plan according to lo which work has haq been started complicates com corn tho work of the engineer to lo omo iome extent from an un economical standpoint but It I Is known that the time management Is Js pleased with tho re results re- re uita so far fa attained |