| Show I VEST EST ENI E. HAS 5 BIG DIG ORE ORD BODY nODY Biggest Part of or orG G 65 Feet reet Width Runs Run 30 O to 80 The bl big ledge struck some time ago at the foot of oC the foot oot shaft In Inthe inthe the he West est End mine at Tonopah has been developed and Is known to extend ex ex- tend In width for a space of or over 6 65 feet It Is Interlined with of or orIon low Ion ow grade ore but the biggest est part of or It will a assay sa from 50 5 0 to 80 S 0 a aon aton aton ton on says S the Tonopah Bonanza Th The company compan has started a raise ralsa 65 feet teet east of the shaft on this level leel and are arc arenow arenow now up lip a 3 distance of about 15 feet feeL The rhe entire raise ralso Is in ore and there thore theres Is s a four foot seam as assaying about 70 70 iO a ton and the values are arc getting richer Ichor as the work progresses ses On the foot level considerable ore oro Is being extracted Two machines are being being- worked at a point feet vest west of the shaft and find a large bod body of or orore ore Is exposed work Is IsI being done at a a. point feet west of oC I the shaft where a machine drill Is 13 w working In the quartz |