Show I CHAFEY MILL GRINDS 40 TONS A DAY 40 ORE ORETho The Tho Chafey mill ml continues to grind out out 40 tons of oC oro daly dally daily which will wi average a ton The pro production will wi be increased as soon as the erection tion ton of ot the hoist is completed enabling Jn ling hug the use of the new ne- shaft haft which wH nill bo be connected by drift with wih the old shaft hat the coming week A fine lino grade grade of ore was struck last week In the u bottom bet bot t- t tom torn of tho the new shaft shaf which at tho the pre present ent tm time is m-c m tl C feet reet wi lo on the entire entre width of or tiro T drift Three shifts of or mon men continue sinking from tho the GO- GO foot level ol on the original Black Hole Holo ore oro shoot The Thc uniformity in the theal values values al val val- alues ues of or the ore found in iii this shaft demonstrate dem deni- em- em great bodies of we UlC which lie lo burled in In the tho tl hiI lull hill |