Show I VER HAS GOLD SECTION OF PROMISE Ledge 20 Feet Wide Is Opened F Four ur Thousand Feet On Surface SOME SHIPMENTS MADE Drift Is Being Made on 1 00 Level for Intersection of Cross Fissure rei On tin the Lime Point property properly near Nev e ethe the Frances Frinces Limo Lim Point Mining company compan I Is conducting operations which ar art attracting spread Intel Interest t in that section Sev SC cral ral shipments of good ore have al already already nl- nl r ready dy been ioen made tn the Goldfeld sam sani- fal fair ah piers which have returned a i profit Manager lana e P. P L. L Duff Duffy W was In 10 Gol feld on business connected with wih the mine and e ble believes the concern will wll wil prove Drove a n decided td success t Unlike th the Great Western estErn vein tho the carries formation on the Lime Point I values alues almost entirely In gold sold The rhe great highly mineralized lead upon which this titis work ork Is being lone done shows show I a width in places of oC 20 O feet and has been opened on the surface for a distance dis tance tanco of or feet feel ef At a depth of or 4 4 feet the vein Is ful fully 20 O feet I wide and carries excellent values An Incline shaft has been sunk on the main east ensi and west lt lead and und hAS hns been in ore ole all ali alithe the W way down t to tn the foot fool level level At that depth a drift hn has been run to the east cast toward the the Intersection of oC another vein ein In which was 35 op opened ned up 40 days ays ago o n by Mr Ml Duffy Duff Dufy and which at nt ati nta a i depth of oC but 10 feet feel gives I es splendid paintings of oC gold T f Tuo Loads to loin JoIn While hil the main lead dips dip to tn the south the cross fissure meeting it on ona ona tn a diagonal cour course e. e dips to the north norh and nd at Rt tho the Junction of oC tho ho two both bothof of or which carr carry 01 ore of oC shipping value It itis I Is thou thought ht that a tine bod body of rich ore oro will wi be he encountered If I these hopes are Arr re justified when th the objective point I is reached a vertical shaft aft will wi be sunk near the point of or contact of oC the tha two veins vein and ane the gasoline hol hoist t and plant now on the lie ground round will wi be in installed installed In- In stalled at once On the same lead two lea leases N are arc arenow arenow now worl working n which hF have opened hl high h grade grale ore The Fhe Coin Metals lease adJoining adjoining ad- ad Joining the Frances Lime Point t la Is sacking Ol ore for Cor shipment runs from Crom 47 7 to 17 and ann ha has shipped paying ore to the samplers To 0 the west on the Limo Lime Point Extension Extension Ex Ex- tension the oUe Dp brothers have o H ii Hl i l lease a as on tho the same me lend lead from froni which the they have hav taken samples samples- of oC i ore lore as assaying assaying as- as a- a saying In 6 and t ha have opened opener a three foot vein of or lead sliver ore ore some fome o of which I Is said to carry carn 2000 ounces of th the white metal metal The me surface Indications Indi Indi- caton of or the section ecton are said Mid to be unparalleled for continuous miner and every one who has looked Into th the mineral possibilities of oC this territory I is enthusiastic over O It its fu fu- fu ture With the coming of 0 the railroad railroad rail rail- rail rail- road rond or the construction of or a n mill mi a larger tonnage will wi be Immediately available for treatment treatment |