Show WATER MAINS LOWERED READY FOR CONTRACTOR Tho The force Coree of oC men under direction of Thomas Hobday superintendent of waterworks which h has s been en engaged in tn lowering the tho water ater mains on last East First i South street finished that work wort Thursday and will begin work worl on th the thO of ot the mains on B II street from First to Second avenues l The estimate est for Cor or the East First South Souta street wor work ork was U and Superintendent nt Hobday says tho actual cost was less les tItan than th the tho estimate The Tue contractor P. P J. J Moral Morad who is 11 laying layIng- the asphalt has now reached as far as Eleventh East street but is It tied up there lJ by some somo of or the property owners who object to California asphalt and want the tho Utah Utan article I If this difficulty Is satisfactorily straightened straight straight- ened out Pat Mo ran thinks s he lie will havo the whole street paved well within within with with- in v t two months S r. r I |