Show LEGAL NOTICE TO 10 W ATEn USERS STATE ENGINEERS ENGINEER'S OFFICE SALT I Lake City Utah January 29 2 9 1909 Notice Is hereby given that tho Development Do company tho as assignee as- as asI I signee of ot It n. K Ii by Its vice I president B. B 3 II if whose address addre Is Evanston Wyom- Wyom has made nado application In anco with the tho requirements of ot Chapter los Se Session slon Laws of or Utah 1905 as amended b by the Session Laws of ot Utah I 1907 to appropriate twenty five c i 25 I cubic feet per second of ot water from tram I Bear river Summit county Utah Said t I water will be bo diverted at a point which bears south 5 53 degrees t 45 minutes east I I feet from tram tho northwest corner of ot Section 13 18 13 Town Township 3 north Range I 9 c-a c east t. t Salt Lalo LaIo base baRe and meridian I j and conveyed by means of a canal and I J II I flume for tor a distance of feet and I there used from January 1 to December Decem bet ber 31 inclusive of or each year to develop develop develop de de- de- de power for tor the purpose of ot electric lighting and propelling machinery In Summit and Rich counties Utah md Uinta county Wyoming After having been so 80 diverted and used the water r will be bo returned to the natural channel o of ot f Yellow Tollow creek a tributary of ot Bear Dear r river iver at a point which lies 00 feet west of the northeast corner of oC Section 2 22 2 Township 12 north Hang Kango west vest vest Kansas base e and meridian This application is I. designated In th the tho I s state tate engineers engineer's office as No o. o 2014 OH All Mi protests t against the granting of ot s said aid application stating the reasons st t mu must t be made mado b by affidavit In In duplicate and tiled filed in this office with 1 I In n thirty 30 days after the completion comple t LIon ion of or the publication of this notice CALEB TA TANNER XEn State Engineer Date of ot first tint publication February 9 9 date of completion of ot publication I March arch 11 Ii Li |