Show us AV W BIG TUNNEL T leadville Lead villo colo coto may 23 those in charge of the work at the tennessee pasa pass tunnel on the denver kio rio grandc grande take a very discouraging view of the possibilities of ever being able to move the immense mass of debria debris that haa has accumulated as a result of the recent cave cae in there ie Is a large force at work but practically no progress is being made material running in as a fast as it can be taken out chief engineer richard and a corps of assistants assi cre ere working night and day but it la Is believed that the tunnel will eventually have to I 1 be abandoned the towne towns tn in the eagle aher rh er valley are serio handicapped by the sas gas pension af traffic and plans are being discussed discua aed of relaying the track over oyer the old right of way over the pass |