Show S LEGHORN LEASE INLINE INLINE IN INLINE H LINE FOR WEALTH Tunnel Project Regarded With Mini Min Min- I Great Favor by I i ing lug Men I I I Mining men who vIm are arc familiar with S conditions In t tie tho adjoining blocks 9 of ot 1 I ground g In the estates of or the tho Soven Se I Troughs Consolidated and un o I I Trou Troughs hK SI Signal 1 Peak Companies COi covered coy cov i ered oreel b by time the Clo leases regard as a n. practical certainty that thal tho tIme project pro- pro I j II I of oC tunneling under both lea leases es esI I will demonstrate two of time the foremost 1 mines milies In time the district says Rays the tho Seven Se I Troughs Minor It will swill rr result In tho tIme S most thorough development c of oC tho time Signal SIJ- SIJ nal Peak le ledge ge tho the continuity of ot which has ben been proven pro for Cor more than a mile and which lull parallels on oil the west weRt time the rich ledge system of oC time the Seven SO Troughs Mining company A complete plant of ot machinery for foJ driving ln time the tunnel has b Mr 11 beet been f forwarded to tho time camp by Cle Cleghorn lurn and Salt Snit Lako Lake u associates ocl Tho The lease on Consolidated ground embraces the old Bird tunnel which wn was driven Into the time hill nearl nearly OO feet sonic some time n ago o. o In starting stam operations oper oller- on oil the time Consolidated tease lease Mr Ir horn resumed work worl In this tunnel tunnel tun tun- nel nd which Is IR following along the Signal Sig Sig- Ig- Ig nal imal Peak hedge which has line au nu average crago width of four feet Since PInco work was commenced this tunnel as been advanced advanced ad ad- more than feet further and It Is confidently expected that within th time next 75 jj feet tho time bore boro will catch the rich shoot of ore oro that was wl some sometime sometime sometime time ago opened up on the surface This shoot has ns been proven pro on the surface for more moore that than feet In ii lon length th Its width averages s four feet teet with about a foot of rock that goes better belter than 10 n a ton The remaining three feet of tho timo shoot c carries hl high h milling alu values R Rn and the tho whole hole vein will break brck k down lown a t good gOOi grade of ore On tho the lease of tho tio Eureka Leasing company on Signal SI Peak ground more than O feet of crosscut tunnel work I and amid SO 80 feet eel of drifting has boon been ac accomplished accomplished ac- ac I since simmee operations were ere start start- I ed en The Signal Peak ledge has hns also been opened up on this and Ii in the thc foot SO-foot drift It varies in width from tram six Inches to three feet Ceet with era a average e values of 40 10 and 50 30 a II ton The present plan of the management I Is to push work with all possible vigor in tho the ol old Bird tunnel develop clop developing In ing bot both leases at nt great reat depth rime Tho tun tunnel nel when whew t the tho he program Just outlined outlined out out- lined Is finished will have a 0 length th of 1400 feet ana and will it c under the tho Eureka lease at a n depth of or tOO feet teel The Time greatest depth Ith that will bo be gained m under the Consolidated leases will be beabout beabout about feet |