Show WESTERN NEVADA HAS SIXTY FEET OF ORE I Body of Pay Stuff Likely to Be TOO Feet Wide Wider Says Johnson Western Xo a Nevada a is 15 getting the tho big- big best oro bo body In camp said saidI M. M I M. M Johnson yesterday upon return return- lag ing from a a. a roundup of In Interests Interests In- In threats in iu Noa Nevada a. a On tho level ol Jo of or the tho mine which is feet below beloW tho the tunnel level le cJ wo we have crosscut CO feet feel of or ore oro and the faco fco of at tho the drift Is Jf still tm in ore Judge from rota tho tim way tho the situation ha has worked worked out ed out so far fr the ore oro bo body y will wU be bo feet teet thick thich On tho the tunnel level we wo opened for tor OO feet eeL a 0 body of or oro ore 20 0 feet across Alongside of or this ore oro was about 20 feet of ot C mineralized then 1 12 feet reet of at ore oro cro and more mineralized limestone lime Hmo the tone stone the distance norO R fun llin ont I I mineralized belt I bein being about r 00 foot t On th the level f fot t lelow below the tunnel tuntel j I the mineralized limestone has tins made mado Into lUto ore our Ou assays for the tho CO GO feet crosscut t Indicating that tho the entro bod body will average orge n at least three thre per percent percent cent edit copper The Time crosscut I figure has tas about 30 feet yet yot to run you to got gel Into he the maIt ore oro bOd body tho the one that was vas 20 o foot wf wide e on the time tunnel level nd which there averages n about five o f per percent perCent cent copper The rhe conditions described by Mr r. Johnson as to the bolts of or limestone bols alternating with wIh tho time pro all ni making ino in- in into to o a ft solid Bold ore oro Oro bod body at depth are tho same amo sro as a were encountered In the Mason Maon Ma- Ma 1 son on Valley mine Mr Johnson shares with other heads of at f departments of ot tho time hOlso e head com coin their enthusiasm over tile the o el outcome outcome out- out come ome of or Lusts made of ot the thc Fink Alel- Alel Ing K i process The Western estern Nevada yu a company he Sf 8 is i already figuring upon pon Installing at nt I Its mine a plant using time the Fink Pink process 81 |