Show work started on sewer system the ditching to bo be used in digging the for prices sewer batem aniced list siguid ly was put tj 0 work sundi sund I 1 and is making excellent progress au in ili the work the machine is corking floal the tile towards the busi business section and lias hai already dus du two blocks blois of the tile jiin lilt trench when watking under favorable favo niblo conditions thom the michino 1 is capable of digging ann two 0 hun arld bards pir day A number of Jj Ja pinese workmen are also at work on the ditches and will be rus litI toan adib finish fillish |