Show OHIO IN JS i Operation III In Shall A Tunnel Urn go I Reports to the thc contrary not notwithstanding standing the Ohio Copper company compan has not closed its operations at BIngham ham hamand and anti has no Intention of oC doing so Work ork In the tho shaft was discontinued a week a ago o with tho the completion of or timbering to the time GOO 1 level vel which had been intended intend Intend- ed all alon along Work oll is being continued I as usual In the tho Mascott ascott tunnel and on the big mill The reason for Cor suspending work In the shaft Is to avoid time the expense of ur pumping The tunnel In a n short time will have i reached cached a n point where it will drain the shaft anti and then sinking to connect with the time tunnel will be bc resumed resumed re re- re- re The tunnel s now from Crom to s SOO 00 feet front from the point of oC connection with the Ohio workings working |