Show NO CONTRACTS ARE LET BY THE BOARD OF WORKS The board ot of lu public lc works Dorics held a veiling and ull received meeting Friday t t bids s from I P. P J 3 Moran and J J- J D. D li for tor work on J paving extension No 0 18 1 The Tho contract was WU not awarded however how how- ever e for the bids bills were In itemized Itemised form and amt It will require some time to complete complete com corn vI the he summary summary- City Engineer Kel- Kel tabulation today tho tue will trill soy prepare 1 It had been planned to award the contract I for Cor the tho new sewer pumping station which Is to be used In pumping staton the sewa sewage sew e from the Intercepting sewer Into the gravity sewer newer but thus thuM far no bids have havo bum bemi submitted G. G p P. P Kennedy Kennet Ken Ken- Ids net nedy who vho ib u. constructing time the Intercepting Inter Inter- net sewer attended the time meeting or orthe and J at the lu suggestion of members othe o 0 the thc board promised to submit su a bid for forthe forthe forthe The Tho specifications the con contract tract within 30 days call cal for or a a supply of or feet of Jf Inch 24 Inoh pipe In Iii addition additon to tho the construction of or the time pumping station |